000 | cam a22 a 4500 | ||
---|---|---|---|
999 |
_c7623 _d7623 |
||
003 | BD-DhIDS | ||
005 | 20180429005621.0 | ||
008 | 180428s1986 ii ||||| |||| 00| 0 eng d | ||
040 |
_aBD-DhIDS _cBD-DhIDS _dBD-DhIDS |
||
041 | _aEng | ||
086 | _aIN IAMR KIS Q-2 | ||
100 | 1 | _aKhan, Q.U. | |
245 | 1 | 2 |
_aA pilot survey of key informants system in Uttar Pradesh : _bdraft report for the second quarter / _cQ.U. Khan |
260 |
_aNew Delhi : _bInstitute of Applied Manpower Research , _c1986 |
||
300 |
_a101p. : _bill. ; _c32 cm. |
||
504 | _aIncludes bibliographical references and index. | ||
650 | 0 | 4 | _aSurveys |
650 | 0 | 4 | _ahousehold survey |
942 |
_2ddc _cDC |