| 000 | 01728nam a2200325 4500 | ||
|---|---|---|---|
| 999 |
_c58360 _d58360 |
||
| 003 | BD-DhIDS | ||
| 005 | 20260913134428.0 | ||
| 008 | 100205s1993 bg e 0 eng | ||
| 040 |
_aBD-DhIDS _cBD-DhIDS _dBD-DhIDS _beng |
||
| 086 | _aBAN MIWDFC BWDB FAP-20 Com | ||
| 110 | 2 |
_aBangladesh. Ministry of Irrigation, Water Development and Flood Control _bBangladesh Water Development Board _bFlood Plan Co-ordination Organization |
|
| 245 | 1 | 0 |
_aCompartmentalization Pilot Project (FAP 20): _bSummary of the integral planning and detailed construction cost estimate, Tangail and Sirajganj / _cprepared by Euroconsult ... [et al.]. |
| 246 | 1 | 4 | _aCompartmentalization Pilot Project, FAP 20, Tangail, v Geographic Information System |
| 246 | 1 | 4 | _aSummary of the integral planning and detailed construction cost estimate: Tangail and Sirajganj |
| 260 |
_aDhaka : _bMIWDFC, _c1993. |
||
| 300 |
_ai, 47p.: _bill., maps ; _c31 cm. |
||
| 500 | _aWith reference to Tangail District, Bangladesh. | ||
| 500 | _aUnder assignment to Directoraat Generaal Internationale Samenwerking, Government of the Netherlands and Kreditanstalt Für Wiederaufbau." | ||
| 504 | _aIncludes bibliographical references and index. | ||
| 650 | 0 | 4 |
_aEnvironmental impact analysis _zBangladesh _zTangail District _vMaps. |
| 650 | 0 | 4 | _aCost effectiveness |
| 650 | 0 | 4 |
_aFlood control _xFinance |
| 710 | 2 | _aEuroconsult (Organization) | |
| 710 | 2 | _aLahmeyer International | |
| 710 | 2 | _aBangladesh Engineering and Technology Services | |
| 710 | 2 | _aHouse of consultants | |
| 710 | 2 |
_aGovernment of Netherlands _bDirectoraat Generaal Internationale Samenwerking |
|
| 710 | 2 |
_aFederal Republic of Germany _bKreditanstalt Für Wiederaufbau |
|
| 942 |
_2BIDSN _cDC |
||