000 | 00722cam a2200241 a 4500 | ||
---|---|---|---|
999 |
_c49346 _d49346 |
||
003 | BD-DhIDS | ||
005 | 20180719131126.0 | ||
008 | 180719t1990 wau||||| |||| 00| 0 eng d | ||
020 | _a0821315366 | ||
022 | _a02537494 | ||
040 |
_aBD-DhIDS _cBD-DhIDS _dBD-DhIDS |
||
041 | _aEng | ||
086 | _aUN WB TP-120 | ||
100 | 1 | _aPlusquelle, Herve | |
245 | 1 | 4 |
_aThe gezia irrigation scheme in sudan : _bObectives, design and performance / _cHerve Plusquelle |
260 |
_aWashington : _bThe World Bank (WB) , _c1990 |
||
300 |
_a90p. : _bill. ; _c25 cm. |
||
490 |
_aWB Technical Paper _vNo. 120 |
||
504 | _aIncludes bibliographical reference | ||
650 | 0 | 4 | _aperformance |
650 | 0 | 4 | _airrigation |
942 |
_2ddc _cDC |