000 | cam a22 a 4500 | ||
---|---|---|---|
999 |
_c44254 _d44254 |
||
003 | BD-DhIDS | ||
005 | 20180423230345.0 | ||
008 | 180423s2010 bg ||||| |||| 00| 0 eng d | ||
040 |
_aBD-DhIDS _cBD-DhIDS _dBD-DhIDS |
||
041 | _aENG | ||
086 | _aBAN MP IMED Imp-5 | ||
110 | 2 | _aBangladesh. Ministry of Planning | |
245 | 0 | 0 | _aImpact evaluation study on construction of large bridge/culverts on important feeder and rural road. |
260 |
_aDhaka : _bIMED , _c2010 |
||
300 |
_axii, 76p. : _bill. ; _c26 cm. |
||
650 |
_aRoad construction _zBangladesh |
||
650 | _aCulverts | ||
650 | _aBridge | ||
942 |
_2ddc _cDC |