000 | cam a22 a 4500 | ||
---|---|---|---|
999 |
_c17058 _d17058 |
||
003 | BD-DhIDS | ||
005 | 20180506214008.0 | ||
008 | 180506t2002 ph ||||| |||| 00| 0 eng d | ||
020 | _a16555236 | ||
040 |
_aBD-DhIDS _cBD-DhIDS _dBD-DhIDS |
||
041 | _aEng | ||
086 | _aXP ADB ERD TNS-4 | ||
100 | 1 | _aDole, David | |
245 | 1 | 0 |
_aEconomic issues in the design and analysis of a wastewater treatment project / _cDavid Dole |
260 |
_aManila : _bADB , _c2002 |
||
300 |
_a30p. : _bill. ; _c32 cm. |
||
490 |
_aERD Technical Note Series _vNo. 4 |
||
504 | _aIncludes bibliographical references and index. | ||
650 | 0 | 4 | _aDevelopment projects |
650 | 0 | 4 | _aProject design |
650 | 0 | 4 | _aWaste water |
942 |
_2ddc _cBK |