Header Logo
Normal view MARC view ISBD view

Rehabilitation Of Monora Breakwater Karachi Discussions On The Alternative Methods Of Protecting The Structure/

By: Pakistan Planning Commission.
Material type: materialTypeLabelBookPublisher: Pakistan: 1961Description: Series : ill. ; 24 cm.
Tags from this library: No tags from this library for this title. Log in to add tags.
    average rating: 0.0 (0 votes)
Item type Current location Collection Call number Copy number Status Notes Date due Barcode
Serials Serials BIDS Library and Documentation Center
Documents
Non-fiction PAK PC 40 (Browse shelf) C-01 Available available 018003

Includes bibliographical references.

Click on an image to view it in the image viewer

Last Updated on April 2, 2019
© BIDS Library. All Rights Reserved
Staff Login
// //]]>