Compartmentalization Pilot Project (FAP 20): Summary of the integral planning and detailed construction cost estimate, Tangail and Sirajganj / prepared by Euroconsult ... [et al.].
By: Bangladesh. Ministry of Irrigation, Water Development and Flood Control Bangladesh Water Development Board Flood Plan Co-ordination Organization.
Contributor(s): Euroconsult (Organization) | Lahmeyer International | Bangladesh Engineering and Technology Services | House of consultants | Government of Netherlands Directoraat Generaal Internationale Samenwerking | Federal Republic of Germany Kreditanstalt Für Wiederaufbau.
Material type:
BookPublisher: Dhaka : MIWDFC, 1993Description: i, 47p.: ill., maps ; 31 cm.Other title: Compartmentalization Pilot Project, FAP 20, Tangail, v Geographic Information System [Cover title] | Summary of the integral planning and detailed construction cost estimate: Tangail and Sirajganj [Cover title].Subject(s): Environmental impact analysis -- Bangladesh -- Tangail District -- Maps | Cost effectiveness | Flood control -- Finance
| Item type | Current location | Collection | Call number | Copy number | Status | Notes | Date due | Barcode |
|---|---|---|---|---|---|---|---|---|
Documents
|
BIDS Library and Documentation Center Documents | Non-fiction | BAN MIWDFC BWDB FAP-20 Com (Browse shelf) | C-01 | Available | Available | 104329 |
With reference to Tangail District, Bangladesh.
Under assignment to Directoraat Generaal Internationale Samenwerking, Government of the Netherlands and Kreditanstalt Für Wiederaufbau."
Includes bibliographical references and index.

Documents